The first layer of the floor is a waterproof chipboard, that will be covered with a concrete screed containing underfloor heating, and then engineered oak floor boards.
And the rear wall is also beginning to be built up. This will be timber framed, with a single blockwork wall behind, and then cedar cladding on the outside.
And the rear wall is also beginning to be built up. This will be timber framed, with a single blockwork wall behind, and then cedar cladding on the outside.
Comments
Post a Comment